TOP > News in 2015

News in 2015

2015

Jun. 30
Small Robot Developed to Investigate Interior of Primary Containment Vessel of Fukushima Daiichi Nuclear Power Station Unit 2 (Jun. 30, 2015) PDF
May. 28
Executive Appointments (May. 28, 2015) PDF
Apr. 30
“Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)”- Results of site test “Investigation B1” on grating around the pedestal inside Unit 1 PCV - (Apr. 30, 2015) PDF
Apr. 20
“Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)” - Results of follow up check after the site test - [For April 18 and 19, 2015] (Apr. 20, 2015) PDF
Apr. 17
“Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)” ‐ Site test “Investigation B1” on grating around the pedestal inside Unit 1 PCV ‐ [Prompt report for April 16, 2015] (Apr. 17, 2015)PDF
Apr. 16
“Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)” - Site test “Investigation B1” on grating around the pedestal inside Unit 1 PCV - [For April 15] (Apr. 16, 2015) PDF
Apr. 13
“Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)” - Site test “Investigation B1” on grating around the pedestal inside Unit 1 PCV - [For April 10] (Apr. 13, 2015) PDF
Mar. 27
Cosmic-ray Muon Technology to be Used To Image Debris Inside Fukushima Dai-ichi Reactors -Can image debris as small as 30-cm size- (Mar. 27, 2015) PDF
Mar. 19
Reactor imaging technology for fuel debris detection by cosmic ray muon. Measurement status report in Unit-1 (Mar. 19, 2015) PDF
Jan. 5
Office relocationPDF