Bacic data of Fukushima Daiichi Nuclear Power Plant(Summary)

Items Unit 1 Unit 2 Unit 3
uel debris retrieval
(the earliest case)
1st half of FY2020 1st half of FY2020 2nd half of FY2021
Plant
data
Size
etc.
Reactor
Building
Image reactor building size
(1) approx.40m approx.46m approx.46m
(2) approx.45m approx.46m approx.46m
(3) approx.0.5-1.5m approx.0.5-1.5m approx.0.5-1.5m
Material Ferroconcrete Ferroconcrete Ferroconcrete
PCV Image PCV size
(1) approx.32m approx.34m approx.34m
(2) approx.10m approx.11m approx.11m
(3) approx.18m approx.20m approx.20m
(4) approx.8m approx.9m approx.9m
(5) approx.2m approx.2m approx.2m
(6) min.15mm approx.17-34mm approx.17-34mm
Material Carbon steel Carbon steel Carbon steel
RPV Image RPV size
(1) approx.19m approx.21m approx.21m
(2) approx.4.8m approx.5.5m approx.5.5m
(3) approx.16cm approx.14cm approx.14cm
(4) approx.18.4m approx.18.4m approx.18.4m
Material Carbon steel
(with stainless steel lining)
Carbon steel
(with stainless steel lining)
Carbon steel
(with stainless steel lining)
Weight of UO2 77t 107t 107t
Tempe
-rature
Temperature
at the bottom
of RPV
As of 6/25, 2014
(to latest data)
25.4℃
(VESSEL BOTTOM
HEAD)
33.9℃
(VESSEL WALL ABOVE BOTTOM HEAD)
32.1℃
(VESSEL BOTTOM
HEAD)
Temperature in
PCV
As of 6/25, 2014
(to latest data)
25.6℃
(HVH-12A RETURN
AIR)
34.1℃
(RETURN AIR
DRYWELL COOLER)
30.8℃
(RETURN AIR DRYWELL COOLER)
Temperature in
reactor building
As of 11/14, 2013
13.3℃
(reference) Outdoor air temperature 12.0℃
21.1℃
(around south east corner on 1st floor)
(reference) Outdoor air temperature 12.0℃
14.1℃
(reference) Outdoor air temperature 12.0℃
Temperature of
accumlated water
in torus room
4.8-22.8℃
(As of 2/20,2013)
16.3-25.2℃
(As of 4.12,2013)
Unidentified
Temperature of
accumlated water
in triangle courner
32.4-32.6℃
(As of 9.20,2012)
30.2-32.1℃
(As of 6.28,2012)
Unidentified
Humi
-dity
Humidity in PCV 100%(the form of a mist as of 10,2012) 100%(dripping as of 7,2013) Unidentified
Humidity in RPV Unidentified Unidentified Unidentified
Air Flow rate of nitrogen injection
(to latest data)
PCV:27.73Nm3/h
PCV: – Nm3/h (Shutdown)
PCV:15.40Nm3/h
PCV: – Nm3/h (Shutdown)
PCV:16.40Nm3/h
PCV: – Nm3/h (Shutdown)
Hydrogen concentration in PCV
(to latest data)
System A: 0.01vol% System A: 0.05vol% System A: 0.05vol%
pressure Pressure in PCV
As of 6/25, 2014
(to latest data)
3.9kPa g 5.18kPa g 0.23kPa g
Dose
rate
Dose rate in PCV approx. 11.1Sv/h
(As of 10.10,2012)
approx. 72.9Sv/h
(As of 3.27,2012)
Unidentified
Dose rate inRPV Unidentified Unidentified Unidentified
Dose rate in the building Please refer from the survey map for air dose rate in the buildings  →Survey map
Dose rate in torus room 200-2400mSv/h
(As of 5.30,2013)
4.3-137mSv/h
(As of 4.12,2013)
100-360mSv/h
(As of 7.11,2012)
Radio
-active
concent
-ration
Radioactive
concentration
in PCV
(Xe135)
(Bq/cm3)
As of 6/25, 2014
(to latest data)
System A: 1.58E-03
Measurable limits: 4.76E-04Unit:Bq/cm3
System A: ND
Measurable limits: 2.2E-01Unit:Bq/cm3
System A: ND
Measurable limits: 3.2E-01Unit:Bq/cm3
water
level
Water level of
accumulated
water in PCV
Approx. 2.8m from bottom part
(As of 10.10,2012)
Approx. 0.3m from bottom part
(As of 6.6,2014)
Estimated to be approx. 6.5m from bottom part (As of 5,2014)
Water level of accumlated water in torus room OP3700mm
(As of 2.20,2013)
OP3160mm
(As of 1.16,2014)
OP3370mm
(As of 6.6,2012)
Water level of accumlated water in triangle courner OP3910-4420mm
(As of 9.20,2012)
OP3050-3190mm
(As of 6.28,2012)
OP3150
(As of 6.6,2012)
data of
fuel
debris
Mass of fuel debris Unidentified Unidentified Unidentified
Distribution of fuel debiris (assumption) Most of the fuel has fallen down into the PCV Existing the core part, lower plenum and PCV, but the ratio among those locations is unknown Existing the core part, lower plenum and PCV, but the ratio among those locations is unknown
MCCI products Unidentified Unidentified Unidentified
Dose rate Unidentified Unidentified Unidentified
Hardness Unidentified Unidentified Unidentified
Density Unidentified
Refer to page 14 regarding to the hardness of simulated debris.

*RPV:Reactor Pressure Vessel         *PCV:Primary Containment Vessel