FY 2020 R&D Report
Summary of the FY 2020 R&D report conducted by IRID has been released.
* Click on the title to open the PDF files.
R&D on fuel debris retrieval
- Development of technology for detailed investigation inside the primary containment vessel (on-site demonstration for detailed investigation inside PCV through X-6 penetration)
- Development of Technology for Containing, Transfer and Storage of Fuel Debris
- Development of Technology for Gradually Increasing Retrieval Scale of Fuel Debris
- Development of Technology for Detailed Investigation inside Primary Containment Vessel(On-site Demonstration of Technology for Detailed Investigation Considering Deposit Measures)
NEW! Updated on April 20, 2022 - Development of Technology for Investigation inside Reactor Pressure Vessel (RPV)
NEW! Updated on April 20, 2022 - Development of Analysis and Estimation Technology for Fuel Debris Characterization
NEW! Updated on April 20, 2022 - Development of Technology for Further Increasing the Scale of Retrieval of Fuel Debris and Reactor Internal Structures(Technological development related to ensuring safety during fuel debris retrieval)
NEW! Updated on April 20, 2022 - Development of technology for further increasing the scale of retrieval of fuel debris and reactor internals (Development of technology for dust collection system of fuel debris)
NEW! Updated on April 20, 2022
R&D for Disposal and Treatment of Radioactive Waste
- R&D for Treatment and Disposal of Solid Radioactive Waste
NEW! Updated on April 20, 2022
- Research and Development
- Released research report
- FY 2018 R&D Report
- FY 2017 R&D Report
- Introduction Research
- Survey Device (Shape-changing Robot) Deployed to Inspect Interior of Primary Containment Vessel (PCV)
- Work Training of Device (Shape-changing Robot) to Inspect Interior of Primary Containment Vessel (PCV) [Hitachi-GE Nuclear Energy]
- Development status of equipment for internal PCV investigation [TOSHIBA]
- Robots working inside the buildings at Fukushima Daiichi NPS (Part III) Swimming robot & Crawling robot
- Robots working inside the buildings at Fukushima Daiichi NPS (Part II) MHI-MEISTeR
- Robots working inside the buildings at Fukushima Daiichi NPS Rosemary & Sakura
- Development Status of PCV Leakage Investigation Devices (Toshiba)
- Preliminary Test for “Water Stoppage Method” by Grouting into the Vent Pipe